|
WEEK
FOURTEEN
Monday,
17th February
Pavs back complete
with new propshaft from nottingham. - The curse has been lifted and its
all action to catch up on lost time from last week, plus Roger the painter
has been booked for this coming weekend to apply 5 coats of undercoat,
base coat and laquer to the chassis come what may, so its got to
be ready by Saturday lunchtime or it will get painted anyway !!
The steering box is
re-aligned and mounted on a Pav special bracket. A new boomerang shape
steering arm is fitted to the front axle stub to allow the shocker to
run inside the turning circle of the steering mechanism. The drag link
is MAN one end and ERF the other, so this has to be grafted together to
be a complete, strong drag link

So thats the steering
geometry sorted and finished, after much debate over many weeks !! All
in one day.
We need then to fabricate
the exhaust smoke box mounting brackets, together with the rear shock
absorber brackets, side guards, rear axle - tramp bar and much, much more,
all by Friday night.
Saturday AM is spent
preparing the chassis for painting and vacate the workshop by 12.00 for
Roger to take over and apply his many years experience of applying
paint. I kept having a look in the workshop Sat. PM and Sunday checking
the room temperature and colours and finishing touches of this metallic
heavily laquered lump of steel

End of week 14 -
6 weeks to go.
|