WEEK
ELEVEN
Monday,
27th January
First thing Monday
we load the engine complete with crate on top of the chassis rails to
try and figure out the optimum engine position for the axle weight split
front and rear, on the weigh pads. We also hang the side guards on to
see for the first time if shes going to look like a proper race
truck, when weve finished, low, pretty chic, and very, very fast!!

The calculations are
done once again with the front pulley of the engine directly above the
track rod. The cab then comes back off and work resumes on the chassis,
then its the chassis underframe to figure out !! For next week.
Meanwhile the 5 new
air and water tanks have arrived from Italy and look good. Ben showed
me the invoice for them and I fell off of my chair. The intercooler and
radiator are back from Sercks recored to my special specification with
unpainted core for added cooling. The intercooler is a Horney special,
as is 2 x ERF 14 litre coolers grafted together, so twice the volume of
a standard road motor, plus some water spray should make optimum cooling.
Only trouble is Sercks could only test it to one bar. As I intend
to create 5 bar boost pressure, we will test it properly at the first
meeting, and hope for the best !!

The cost of Sercks
work was reduced by 30% in return for carrying their sticker, so the 2nd
bit of sponsorship, be it only small, but it all helps.
|