WEEK
TEN
Monday,
20th January
The cab roll over
bar is all in place and being welded up.

Whilst the inside
of the cab is taken up with the welder we lift the cab back onto the chassis
to fabricate the cab mountings and design to Rollbar feet to come through
the base of the cab to secure the roll bar to the chassis.

We strap up the front
& rear suspension to simulate fully laded ride height, and the calculations
begin, to mount the cab as low as possible.

Up and down to the
machine shop the boys spend many hours getting it all set up spot on.
With the finished
cab position you can now see we have lowered by some 18 inches from the
original photos in week (2) together with the suspension a further 9"
shes just dropping and dropping lower than any ERF ever made.

By the end of the
week shes low but its hard to believe the whole project must
be ready in just 10 weeks time!!
|